MANUGURU
Manuguru Plant is the most prestigious and state of art external Coal handling Plant which serves as a lifeline of the Heavy Water Plant, Manuguru under the Department of Atomic Energy Govt. of India. From the successful Construction, we are operating the plant for over 30 yrs with 100% of coal requirements being transported via
NEPAL
Built for Nepal Orind Magnesite Ltd., Kathmandu, Nepal. It has a capacity of 150 TPH and is a Monocable Ropeway. It is 11.2 KM long from Kharidunga to Lamasangu in Nepal. SYSTEM Monocable Ropeway Type of Material
BHUTAN
Design & Engineering, Supply, Testing & Supervision of erection installation of Ropeway over Barsa River was undertaken for the Bhutan Carbide & Chemicals Limited, Bhutan. It was a challenging project as a river needed to be crossed, however the same was done with immaculate planning and execution by our experienced engineers. SYSTEM
ETHIOPIA
Large limestone deposits were discovered in ETHIOPIA over the last ten years. Ethio Cement Plc is a joint venture company promoted by local and Indian investors. The project site is located in the Oromia Regional State at Chancho, about 40km North of Addis Ababa. The ropeway carries limestone from the quarry next to the Muger
INDUSTRIAL ROPEWAYS
Madhya Pradesh Project 1 This 16.8 KM Bicable Ropeway with a capacity of 150 Tonnes Per Hour from Amarkantak Mines to Choktipani was designed, erected and commissioned on turnkey basis for Bharat Aluminium Co. Ltd., Korba. Project 2 This 18.3 Km Bi-cable Ropeway with a capacity of 50 tonnes per hour transports from Phutakapahar mines
NAGALAND
Revamping of the Bicable Rope-way including design, manufacturing, supply testing, commissioning and operation and maintenance was undertaken for Bhagheeratha Engineering Limited.
JHARKHAND
Designed and commissioned on a turnkey basis for TISCO, Ghatotand, Hazaribagh, and Bihar. It is a 300 TPH, 5.4 KM long Mono-cable Ropeway for carrying coal for their West Bokaro Collieries, Ghatotand, and District – Hazaribagh.
ANDHRA PRADESH
Project 1 A 5.2 KM long Mono-cable Ropeway of 200 TPH for carrying lime stone designed and constructed for K.C.P. Limited, Macherla, A.P. Project 2 A Bi-cable Aerial Ropeway for carrying coal for Captive Power Plant, Heavy Water Project, and Khammam was built on a turn-key basis. It is 9.8 KM long and has a
HIMANCHAL PRADESH
Single Jigback Double Track Ropeways of 6MT payload capacity for Malana-II Hydroelectric Project in Himachal Pradesh (Malana).
About us
DRIL has been a pioneer in the infrastructure and construction business since 1974. We specialise in building Passenger Ropeways, Material Ropeways and Ski-Lifts as well as bulk material handling plants and real estate projects. We also undertake work for the revamping and capacity upgradation of existing ropeways, together with operation and maintenance of running aerial ropeways and material handling plants. We are also engaged in the turnkey construction of Steel and PRC bridges along with Rope Suspension Bridges.
We also undertake work for the revamping and capacity upgradation of existing ropeways, together with operation and maintenance of running aerial ropeways and material handling plants. We are also engaged in the turnkey construction of Steel and PRC bridges along with Rope Suspension Bridges.
We also undertake work for the revamping and capacity upgradation of existing ropeways, together with operation and maintenance of running aerial ropeways and material handling plants. We are also engaged in the turnkey construction of Steel and PRC bridges along with Rope Suspension Bridges.